Winkler Plant — Inspections

Total: 4 inspections

Begin End Operator Hours Inspectors
03/10/2024 03/11/2024 High Roller Sand 14.50 1
02/24/2023 03/02/2023 High Roller Sand 2.50 1
02/19/2023 02/21/2023 High Roller Sand 14.50 1
08/22/2022 08/24/2022 High Roller Sand 33.50 2