Winn Pit — Inspections
Total: 4 inspections
| Begin | End | Operator | Hours | Inspectors |
|---|---|---|---|---|
| 07/02/2024 | 07/02/2024 | Fisher Construction Agg. | 2.00 | 1 |
| 06/27/2023 | 06/27/2023 | Fisher Construction Agg. | 4.50 | 1 |
| 10/12/2021 | 10/13/2021 | Fisher Construction Agg. | 19.25 | 1 |
| 10/28/2020 | 10/29/2020 | Fisher Construction Agg. | 9.75 | 1 |