WOLDT MINE — Inspections

Total: 7 inspections

Begin End Operator Hours Inspectors
08/07/2019 08/07/2019 Kempen Excavating LLC 5.00 1
09/17/2018 09/18/2018 Kempen Excavating LLC 8.00 1
08/22/2017 08/22/2017 Kempen Excavating LLC 8.00 1
10/25/2016 10/25/2016 Kempen Excavating LLC 6.50 1
12/05/2012 12/05/2012 Kempen Excavating LLC 11.00 1
11/05/2012 11/05/2012 Kempen Excavating LLC 9.00 1
10/02/2012 10/03/2012 Kempen Excavating LLC 24.50 1