XR400 POWERSCREEN — Inspections

Total: 4 inspections

Begin End Operator Hours Inspectors
04/09/2025 04/09/2025 Pratt Trucking and Excavating 1.50 1
12/02/2024 12/03/2024 Pratt Trucking and Excavating 1.75 1
08/07/2024 08/08/2024 Pratt Trucking and Excavating 5.00 1
07/25/2024 08/06/2024 Pratt Trucking and Excavating 10.75 1