Yakima Wash Plant — Inspections

Total: 6 inspections

Begin End Operator Hours Inspectors
11/13/2003 11/19/2003 Central Pre-Mix Concrete Co 51.00 1
05/08/2003 05/08/2003 Central Pre-Mix Concrete Co 11.00 1
02/20/2003 02/25/2003 Central Pre-Mix Concrete Co 61.00 3
11/27/2001 11/27/2001 Central Pre-Mix Concrete Co 9.00 1
09/08/2001 09/08/2001 Central Pre-Mix Concrete Co 5.00 1
04/27/2000 05/04/2000 Central Pre-Mix Concrete Co 28.00 1