ZCC Capitol Screening Operation — Inspections
Total: 3 inspections
| Begin | End | Operator | Hours | Inspectors |
|---|---|---|---|---|
| 02/03/2025 | 02/06/2025 | Zachry-Austin North Loop Const... | 8.00 | 1 |
| 08/26/2024 | 08/26/2024 | Zachry-Austin North Loop Const... | 2.00 | 1 |
| 08/08/2024 | 08/08/2024 | Zachry-Austin North Loop Const... | 10.50 | 1 |