SMITH RANCH PROJECT — Inspections

Total: 4 inspections

Begin End Operator Hours Inspectors
07/24/2001 07/24/2001 Rio Algom Mining Corp 19.00 1
01/17/2001 01/17/2001 Rio Algom Mining Corp 12.00 1
05/04/2000 05/04/2000 Rio Algom Mining Corp 14.00 1
02/01/2000 02/04/2000 Rio Algom Mining Corp 22.00 1